127 Park Road Miramar

About

  • The directors of Shock Ltd wanted a light industrial and office building.
  • Capital Construction Ltd undertook the construction entailing:
    • Demolition of the existing building,
    • Installation of screw piles
    • Construction of a new steel frame and concrete slab structure with
    • Timber framed internal and external walls
    • Metal exterior roofing/cladding with aluminium joinery windows
    • Internal fitout of stairwells, core spaces and perimeter walls

Tags