Wellington Airport

About

Wellington International Air-port Limited, Car-Park Extension

Initially the contract was for creation of a Taxi holding rank, and then was changed to a Rental holding car-park due to the growing demands of the Airport.

Work consisted of:

  • Bulk excavation of 4000m3 from existing knoll
  • Excavation and importation of 1200m3 of sub-grade to form 4500m2 car-park
  • New kerb and crossings
  • Remaining battered knoll was covered with weed-mat, hydro-seeded and planted.
  • Supply and installation of chain-link fence and rock-fall fence to the perimeter with gates.
  • Supply and installation of street lighting for security.

Tags