Mega Centre Porirua

About

  • Construction of a new 1800m2 stand alone retail building in the large Mega Centre Porirua complex to house four new large shops.
  • Construction period was 10 calendar months to hand over for the tenants to carry out their internal fitouts.
  • The new building was constructed on the edge of the car-park, and consisted of:
    • Concrete slab floor,
    • Concrete tilt slab and
    • Aluminium shop-front walls, with
    • Structural steel rafter framed roof fixed to the tilt slab walls.
    • Roofing was coloursteel longrun over the structural purlins.

 

Tags